Bodrum's New International Terminal on Schedule!!!
ONLY 4 MONTHS AND COUNTING TILL THE NEW BODRUM TERMINAL OPENS ITS DOORS.
The new terminal has certainly taken shape over the last few months, the Domestic terminal is no longer in use, and the glass front is now on the new terminal building and lit up at night.
Work is currently being done on all the approach roads and car parks, so BODRUM will be open for business as usual this summer, but everyone will feel the benefit of a new modern terminal.
More Investment for the Aegean Coast. Work has starting on the construction of a New International Terminal at Bodrum Airport. This will boost the property markets of Altinkum, Akbuk and Bodrum. It's time to buy property in Turkey, don't get left behind.
It will take two years to complete and when open for business,in May 2012, will have an annual capacity of 5 million tourists passing through its doors.
The Terminal will have 9 boarding bridges in total,and one will be able to accept large jumbo planes catering for it wıth two separate gate entrances. A total of 66 check in desks, large car parking capacity. It will be fitted with the newest high tech security systems, baggage handling systems will also be installed to cope with the increase in traffic.
As the New Terminal takes shape, all the roads from the Airport to the resorts are being widened, this will cut the time of transfers down considerably.
Source:- Teknotes
- Tel:
- 01772 735151
- Fax:
- 01772 735252
- Email:
- mail@turkishconnextions.co.uk
- Tel:
- 028 9085 2293



